• $7.5 Million Abu Dhabi Oil Fields Pump Order

Flow Level Pressure

$7.5 Million Abu Dhabi Oil Fields Pump Order

Dec 28 2010

Flowserve (USA) have received an order worth approximately $7.5 million for Flowserve MP1 multiphase pumps from Abu Dhabi Company for Onshore Oil Operations (ADCO) for the Bida Al Qemzan field development project. The order was booked in the second quarter of 2010.

“This order continues our long history of providing solutions to the oil and gas industry in the United Arab Emirates,” said Tom Ferguson, president, Flow Solutions Group. “Given the challenging specifications for this project, we are very proud that ADCO chose Flowserve MP1 multiphase pumps. We are confident that the MP1’s ability to effectively pump mixtures of oil and natural gas will help ADCO maximize production at the Bida Al Qemzan field.”

ADCO selected Flowserve pumps due to their performance, reliability and ability to meet the high-pressure and corrosion-resistance requirements. The pump packages, which include the suction and discharge piping and drivers, are designed for 190 barg (2,750 psig) maximum allowable working pressure. The pumps are made of super-duplex stainless steel for corrosion resistance due to chloride content in the water of 47,800 parts per million.
 


Digital Edition

PIN 25.1 Feb/March

March 2024

In This Edition Safety - The technology behind the ION Science Tiger XT - Safety with ammonia and LOHCs as hydrogen carriers Analytical Instrumentation - Discussion on new tribology te...

View all digital editions

Events

Hannover Messe

Apr 22 2024 Hannover, Germany

FORUMESURE

Apr 22 2024 Marrakech, Morroco

Oman Petroleum & Energy Show

Apr 22 2024 Muscat, Oman

World Energy Congress

Apr 22 2024 Rotterdam, Netherlands

Asia Pacific Energy Summit

Apr 23 2024 Singapore

View all events