Sensor systems show stability in MC252 well

Flow level pressure

Sensor systems show stability in MC252 well

05 Aug, 2010

Published over 15 years ago. See the latest and most current information on Flow level pressure.

Sensor systems indicate that efforts to clog the leaking MC252 well in the Gulf of Mexico using heavy drilling mud have succeeded in stabilising the structure.

The well has been leaking oil since the failure of the BP-operated Deepwater Horizon rig, with ongoing efforts attempting to staunch the flow and prevent the leak from recurring.

On August 4th, BP reported sensor systems indicated the well had stabilised after heavy drilling mud was pumped in from support vessels on the surface.

"The well is now being monitored, per the agreed procedure, to ensure it remains static," the oil industry operator announced.

"Further pumping of mud may or may not be required depending on results observed during monitoring."

With the well seemingly stabilised, BP commenced the next stage of its efforts to seal the leak on August 5th.

This sees cement pumped into the well, part of the oil industry operator's static kill procedure for the leak and a complementary process to, rather than a replacement of, the relief well being drilled in the area.

PIN 27.2 Apr/May 2026

Explore our Digital Edition

Discover the latest news and research

Digital edition

Explore Our Other Sites

Labmate Online
Enhanced recirculating chiller range
Explore more Arrow
Envirotech Online
Rack-mountable FTIR gas analyser for integrated multi-gas analysis in fixed measurement systems
Explore more Arrow
Pollution Solutions Online
New all-in-one fish silage system for aquaculture and fish processing industries
Explore more Arrow
Chromatography Today
Chromatography and XFEL imaging reveal critical point behind water’s behaviour
Explore more Arrow